Zero Bubble Pipeline Parallelism
arXiv: 2401.10241
领域
TLDR(中文)
把 backward 拆成「计算激活梯度(B)」和「计算参数梯度(W)」两步重新调度,让 W 的计算去填流水线气泡,实现接近零气泡的流水线并行,且在同等显存预算下吞吐优于 1F1B。证明流水线调度仍有结构性红利可挖。
TLDR (English)
Splits backward into activation-gradient (B) and weight-gradient (W) computations and reschedules them so W fills pipeline bubbles, achieving near-zero-bubble pipeline parallelism with better throughput than 1F1B under the same memory budget, proving there is still structural headroom in pipeline schedules.
出现在这些文章里
同被引用
这些论文与本文出现在同一篇文章中
相关论文
同一领域的其他论文